2nd BLC Muara Tuhup, Adaro Mineral Indonesia

2nd BLC Muara Tuhup Project – Adaro Mineral Indonesia. The scope of work included Pile Driving for Ø900 mm piles, Test Pile, and the Installation of a Steel Jacket Platform. For this project, we utilized the 500T SWI Kalimantan X crane barge, along with a vibratory hammer and HHP 14 hydraulic hammer. This equipment was highly suitable for the demands of the project. One of the main challenges was the extremely hard soil conditions, which required Pre-Drilling prior to pile installation. The pile driving process needed to be carried out with a high degree of precision. Despite the challenging conditions and strict adherence to high safety standards , we successfully completed the project effectively and efficiently