Coal Receiving Jetty for the 2 x 1,000 MW Power Plant in Batang, Central Java

Working under Mitsui Engineering & Shipbuilding Co. Ltd., our scope of work is construction service of the coal jetty based on design provided by our client.  We constructed the jetty using our own key personnel and equipment from January 2017 through March 2019.  We completed our scope of work in a timely and safe manner.  It was a big undertaking and proof of our strength and capability.

The jetty's platform measures 374 m by 25 m.  The trestle has a length of 2.5 km which supports a 5-m wide road and the very long coal conveyor line.