Patimban Port Development Project Package 6

The pile driving works for the Container Berth involved the installation of large-diameter Steel Pipe Piles (SPP) with a diameter of Ø1,400 mm and a length of 59 meters. A total of 189 piles were successfully driven.
The piling operation was executed using a suitable piling barge, SWI Sulawesi X, equipped with a 70-meter piling leader.
The driving was performed using a high-performance Delmag D220 diesel hammer, ensuring optimal penetration and installation efficiency.