Piling Work For Jetty 1 Pertamina RU II Dumai

The job was piling work for the renovation and upgrade of Jetty 1 at Pertamina’s refinery RU II in Dumai, Riau.  The piles were steel pipes with outside diameters ranging from 711. 2 mm to 1117.6 mm.  The maximum pile length was 84 m.  The project started in December 2015 and finished timely in May 2016.