Replacement and Repair of Intake Pipeline – Tanjung Jati B Power Plant Unit 2
This EPC project was carried out under PT PLN (Persero), involving the replacement of a Sea Water Intake Pipeline with a diameter of 4,000 mm and a length of 39 meters.
The installation was performed using the Jepara X barge.
The project was successfully completed.